Finalize the design before scheduling concrete

Dimensions alone do not define a concrete project. Thickness, reinforcement, base, slope, joints, edge details, mix requirements, finish, curing, permits, and weather planning must be settled before the truck is ordered.

Calculate every part of the volume

Use length × width × thickness in feet ÷ 27 for rectangular sections. Include thickened edges, steps, footings, separate pads, and irregular areas. The person responsible for the pour should verify the final order amount.

Ask about minimums and time limits

A small order can carry a minimum-load or short-load charge. Ask about delivery distance, environmental or fuel charges, included unloading time, additional wait time, cancellation rules, and the supplier's schedule.

  • Confirmed cubic yards and mix requirements
  • Job address, contact, and requested pour time
  • Chute, buggy, wheelbarrow, or pump placement plan
  • Crew, tools, forms, reinforcement, and curing supplies ready
  • Safe washout and cleanup plan

Have a backup plan before the truck leaves the plant

Weather, access, equipment, form, crew, or inspection problems can stop a pour. Decide who has authority to proceed, who communicates with dispatch, and what happens if the site is not ready.

Common questions

What property owners ask us

Is bagged concrete better for a very small job?+

That depends on total volume, labor, consistency, access, schedule, and the project requirements. Compare the entire mixing and placement plan, not only the unit price.

Will the concrete truck wait while we finish preparing?+

Do not plan on it. Suppliers set unloading and wait-time rules, and concrete has time-sensitive placement limits. The site and crew should be ready before arrival.